PROCEDURES AT WORK

TITLE

-|-

SOLID WOVEN BELT CONDITION ASSESSMENT

AREA

-|-

OUTBYE ENGINEERING

TARGET

-|-

ENGINEER, GES, FOREMAN, FITTER

TIME

-|-

03:43

OUTCOME

-|-

Use of the six criteria listed in the guidelines to assess the condition of solid woven belting installed on trunk conveyors.

-|-

Increase belt reclamation and reduce belting costs.

Sign in